On this job, we were contacted to perform all tasks start-to-finish for constructing a pond. We did all this work in-house from the engineering design, permitting and construction. Below are pictures showing the progress of the Phase I work that was completed just before the snow came. Next spring we will clean up all the excavated material and finish the areas around the impoundment.
20160506_080113web
View of pond area before construction begins.
20160506_080056web
View of pond area before construction begins.
20161024_164812web
Stripping topsoil from pond area and starting a road from the pond to the location where we will pile material.
20161110_130450web
In the middle of the construction phase, excavating material.
20161101_110629web
In the middle of the construction phase, excavating material.
20161104_112129web
Excavation of pond is nearing completion.
20161112_135935web
Excavation of pond is nearing completion. Construction of the island is almost complete.
20161116_161353web
Pond is slowly filling up with groundwater. Topsoil has been placed on island and around edges of pond.
30539web
Pond is almost full.
31027web
Pond is almost full.